FCC Seeks Comment on Section 6409(a) Wireless Facility Modifications Ruling and NPRM (2024)

On June 10, 2020, the Commission released the Declaratory Ruling and Notice of Proposed Rulemaking (“Ruling and NPRM”) in the Implementation of State and Local Governments’ Obligation to Approve Certain Wireless Facility Modification Requests Under Section 6409(a) of the Spectrum Act of 2012 proceeding, which seeks comment on changes to the Commission’s rules implementing section 6409(a) of the Spectrum Act to facilitate upgrades of existing sites for 5G networks (WT Docket No. 19-250).

The Ruling clarifies several aspects of section 6409(a) rules which established a streamlined process for State and local government to review applications to deploy wireless telecommunications equipment on existing infrastructure. These rules require a State or local government to approve any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station within 60 days.

Organized by category, the Ruling makes the following specific clarifications:

  • 60-Day Shot Clock
    • An applicant has effectively submitted a request for approval that triggers the running of the 60-day shot clock under section 1.600(c)(2) when it satisfies both of the following criteria: (1) the applicant takes the first procedural step that the local jurisdiction requires as part of its applicable regulatory review process under section 6409(a), and, to the extent, it has not done so as part of the first required procedural step, (2) the applicant submits written documentation showing that a proposed modification is an eligible facilities request; and
    • A local government may not delay the start of the shot clock by requiring an applicant to submit documentation that is not reasonably related to determining whether the proposed modification is an eligible facilities request.
  • Equipment Cabinets
    • The term “equipment cabinets” in section 1.6100(b)(7)(iii) does not include relatively small electronic components, such as remote radio units, radio transceivers, amplifiers, or other devices mounted behind antennas, and up to four such cabinets may be added to an existing facility per separate eligible facilities request;
    • Having a small piece of transmission equipment mounted on a structure does not make it an “equipment cabinet” simply because it is more visible when mounted above ground; and
    • In response to several localities have who argued that the Commission allowing the maximum number of additional equipment cabinets to be determined for each separate eligible facilities request would permit an applicant to add an unlimited number of new equipment cabinets to a structure so long as the applicant proposes adding them in increments of four or less, the Commission finds this is inaccurate because the text of section 1.6100(b)(7)(iii) limits the number of equipment cabinets per modification to no more than “the standard number of new equipment cabinets for the technology involved.”
  • Concealment Elements
    • The term “concealment element” in section 1.6100(b)(7)(v) means an element that is part of a stealth-designed facility intended to make a structure look like something other than a wireless facility, and that was part of a prior approval; and
    • To “defeat” a concealment element under section 1.6100(b)(7)(v), a proposed modification must cause a reasonable person to view a structure’s intended stealth design as no longer effective.
  • Additional factors influencing whether a modification request qualifies as an “eligible facilities request” that the State or local government must approve within 60 days
    • The phrase “with separation from the nearest existing antenna not to exceed twenty feet” in section 1.6100(b)(7)(i) allows an increase in the height of the tower of up to twenty (20) feet between antennas, as measured from the top of an existing antenna to the bottom of a proposed new antenna on the top of a tower; and
    • The phrase “conditions associated with the siting approval” may include aesthetic conditions to minimize the visual impact of a wireless facility as long as the condition does not prevent modifications explicitly allowed under sections 1.6100(b)(7)(i)-(iv) (antenna height, antenna width, equipment cabinets, and excavations or deployments outside the current site) and so long as there is express evidence that at the time of approval the locality required the feature and conditioned approval upon its continuing existence.

Next, the NPRM seeks comment on whether it should revise the section 6409 rules regarding boundaries of a tower site. Some commenters argue that it is difficult to collocate transmission equipment on existing macro towers without expanding the compounds surrounding those towers in order to deploy additional equipment sheds or cabinets on the ground. On the other hand, the Commission states that localities generally oppose the compound expansion and argue that excavation of up to 30 feet beyond a tower’s current site cannot be considered insubstantial. Given this debate, the Commission seeks comment on the costs and benefits of two possible approaches:

  • First approach, which would allow compound expansion under 30 feet to be included under section 6409(a) streamlined processing: The Commission proposes to revise the definition of “site” in section 1.6100(b)(6) to make clear that “site” refers to the boundary of the leased or owned property surrounding the tower and any access or utility easem*nts currently related to the site as of the date that the facility was last reviewed and approved by a locality. Under this approach, the Commission would also amend section 1.6100(b)(7)(iv) so that modification of an existing facility that involves the ground excavation or deployment of up to 30 feet in any direction outside the facility’s site will be eligible for streamlined processing under section 6409(a).
  • Second approach, which would not allow compound expansion under 30 feet to be included under section 6409(a) streamlined processing: Alternatively, the Commission seeks comment on whether to revise the definition of the site in section 1.6100(b)(6), as proposed above, without making the proposed change to section 1.6100(b)(7)(iv). The Commission would define “site” in section 1.6100(b)(6) as the boundary of the leased or owned property surrounding the tower and any access or utility easem*nts related to the site as of the date an applicant submits a modification request.
  • Comments on the NPRM are due 20 days after publication in the Federal Register.
  • Reply comments are due 30 days after publication in the Federal Register.

Please Contact Us if you have any questions.

Recent Posts

FCC Releases September Open Meeting Tentative Agenda

On September 5, 2024, the FCC released the Tentative Agenda for the September Open Meeting, scheduled for September 26, 2024 at 10:30 AM. The Commission

Read More

September 6, 20249:37 am

FCC Issues Clarification on Kaspersky Covered List Inclusion

On September 3, 2024, the Office of Engineering and Technology and the Public Safety and Homeland Security Bureau (“Bureaus”) issued a Public Notice providing further

Read More

September 5, 20242:28 pm

Updated FCC Application Requirements for International Section 214 Authorizations, Submarine Cable Licenses and Petitions for Section 310(b) Foreign Ownership Rulings

On August 23, 2024, the Office of International Affairs (“OIA”) released a Public Notice announcing that certain rules adopted in the FCC’s 2020 Executive Branch

Read More

August 28, 20249:48 am

FCC Seeks Comment on Section 6409(a) Wireless Facility Modifications Ruling and NPRM (2024)

FAQs

What is section 6409 of the Spectrum Act? ›

This provision states that a “local government may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station”.

What is FCC Nprm? ›

Notice of Proposed Rulemaking | Federal Communications Commission.

What are the FCC regulations for wireless devices? ›

For exposure to RF energy from wireless devices, the allowable FCC SAR limit is 1.6 watts per kilogram (W/kg), as averaged over one gram of tissue. For wireless devices operating in the frequency range above 6 GHz, the guidelines specify power density as the relevant RF exposure limit.

What is the FCC in wireless communication? ›

The Federal Communications Commission

The 1934 Act set up the FCC as an agency to regulate all interstate and foreign communication by wire, radio, telephone, telegraph, and broadcasting. The FCC regulates the offering for sale and use of devices that radiate RF energy (non-ionizing radiation).

What is Section 6409 of the Federal Middle Class Tax Relief and Job Creation Act? ›

6409) Prohibits a state or local government from denying, and requires approval of, any request for collocation, removal, or replacement of an existing wireless tower or base station that does not substantially change its physical dimensions.

What is FCC spectrum? ›

The radio spectrum is the radio frequency (RF) portion of the electromagnetic spectrum. In the United States, regulatory responsibility for the radio spectrum is divided between the Federal Communications Commission (FCC) and the National Telecommunications and Information Administration (NTIA).

How does NPRM work? ›

NPRM. In notice-and-comment rulemaking, an agency must first issue a notice of proposed rulemaking (NPRM) and provide an opportunity for public comment on the proposal before it can issue a final rule. There are exceptions to the requirement for notice and comment.

What is NPRM in law? ›

The proposed rule, or Notice of Proposed Rulemaking (NPRM), is the official document that announces and explains the agency's plan to address a problem or accomplish a goal. All proposed rules must be published in the Federal Register to notify the public and to give them an opportunity to submit comments.

What is the new rule of the FCC? ›

This move aims to address the effect of lead-generated communications on consumers, who often allege they receive numerous unwanted robocalls and robotexts. Under the FCC's new rule, a consumer can only grant one-to-one consent to a particular seller individually.

Can the FCC tap your phone? ›

Federal agents cannot legally tap your phone whenever they want to. They have to follow strict guidelines and go through a specific process to obtain approval.

Does the FCC control cell phones? ›

The FCC is the governing body that primarily makes sure that U.S. communications, including phone service of all types, meet a specific set of standards as it applies to various interests such as regulation, policing, infrastructure, and accessibility.

What does the FCC not allow? ›

Federal law prohibits obscene, indecent and profane content from being broadcast on the radio or TV. That may seem clear enough, but determining what obscene, indecent and profane mean can be difficult, depending on who you talk to.

Does the FCC have jurisdiction over the internet? ›

Over-the-air broadcasts by local TV and radio stations are subject to certain speech restraints, but speech transmitted by cable or satellite TV systems generally is not. The FCC does not regulate online content.

What are the 3 basic elements of a wireless communication system? ›

No matter its nature, each communication system has 3 essential elements: transmitter, medium/channel, and receiver.

Who controls the FCC? ›

An independent U.S. government agency overseen by Congress, the commission is the United States' primary authority for communications law, regulation and technological innovation.

What is the spectrum regulation? ›

Spectrum management is an international and national effort to regulate the use of the electromagnetic spectrum. The electromagnetic spectrum is the main way that those on the ground are able to talk to objects in space. However, spectrum is a finite resource.

What is the FCC Administrative Procedure Act? ›

The Administrative Procedure Act (APA) sets forth the basic requirements for notice and comment rulemaking (also called "informal" rulemaking), the process generally used by agencies to issue legislative rules. Other statutes, executive orders, or agency rules impose additional requirements.

What is Section 611 of the communications Act? ›

Pursuant to Section 611 of the Communications Act, local franchising authorities may require cable operators to set aside channels for public, educational, or governmental ("PEG") use. Public access channels are available for use by the general public.

What is the 2014 Infrastructure Order? ›

The 2014 Infrastructure Order defines “concealed or `stealth' ”-designed facilities as “facilities designed to look like some feature other than a wireless tower or base station,” and further provides that any change that defeats the concealment elements of such facilities would be considered a substantial change under ...

References

Top Articles
Better Than Anything Toffee Recipe
Audi Q8 e-tron Review 2024 | Top Gear
Spasa Parish
Rentals for rent in Maastricht
159R Bus Schedule Pdf
Sallisaw Bin Store
Zachary Zulock Linkedin
Www.myschedule.kp.org
Ascension St. Vincent's Lung Institute - Riverside
Understanding British Money: What's a Quid? A Shilling?
Xenia Canary Dragon Age Origins
Momokun Leaked Controversy - Champion Magazine - Online Magazine
Maine Coon Craigslist
How Nora Fatehi Became A Dancing Sensation In Bollywood 
‘An affront to the memories of British sailors’: the lies that sank Hollywood’s sub thriller U-571
Tyreek Hill admits some regrets but calls for officer who restrained him to be fired | CNN
Haverhill, MA Obituaries | Driscoll Funeral Home and Cremation Service
Rogers Breece Obituaries
Ems Isd Skyward Family Access
Elektrische Arbeit W (Kilowattstunden kWh Strompreis Berechnen Berechnung)
Omni Id Portal Waconia
Kellifans.com
Banned in NYC: Airbnb One Year Later
Four-Legged Friday: Meet Tuscaloosa's Adoptable All-Stars Cub & Pickle
Model Center Jasmin
Ice Dodo Unblocked 76
Is Slatt Offensive
Labcorp Locations Near Me
Storm Prediction Center Convective Outlook
Experience the Convenience of Po Box 790010 St Louis Mo
Fungal Symbiote Terraria
modelo julia - PLAYBOARD
Poker News Views Gossip
Abby's Caribbean Cafe
Joanna Gaines Reveals Who Bought the 'Fixer Upper' Lake House and Her Favorite Features of the Milestone Project
Tri-State Dog Racing Results
Navy Qrs Supervisor Answers
Trade Chart Dave Richard
Lincoln Financial Field Section 110
Free Stuff Craigslist Roanoke Va
Wi Dept Of Regulation & Licensing
Pick N Pull Near Me [Locator Map + Guide + FAQ]
Crystal Westbrooks Nipple
Ice Hockey Dboard
Über 60 Prozent Rabatt auf E-Bikes: Aldi reduziert sämtliche Pedelecs stark im Preis - nur noch für kurze Zeit
Wie blocke ich einen Bot aus Boardman/USA - sellerforum.de
Infinity Pool Showtimes Near Maya Cinemas Bakersfield
Dermpathdiagnostics Com Pay Invoice
How To Use Price Chopper Points At Quiktrip
Maria Butina Bikini
Busted Newspaper Zapata Tx
Latest Posts
Article information

Author: Kareem Mueller DO

Last Updated:

Views: 6022

Rating: 4.6 / 5 (66 voted)

Reviews: 81% of readers found this page helpful

Author information

Name: Kareem Mueller DO

Birthday: 1997-01-04

Address: Apt. 156 12935 Runolfsdottir Mission, Greenfort, MN 74384-6749

Phone: +16704982844747

Job: Corporate Administration Planner

Hobby: Mountain biking, Jewelry making, Stone skipping, Lacemaking, Knife making, Scrapbooking, Letterboxing

Introduction: My name is Kareem Mueller DO, I am a vivacious, super, thoughtful, excited, handsome, beautiful, combative person who loves writing and wants to share my knowledge and understanding with you.